Grid Prep Start free

2.d · Transmission · free sample

Reconfiguration and Switching

2.d Reconfiguration and Switching is one of the 31 knowledge areas in the NERC System Operator Certification content outlines. It is worth 4 scored questions on RC, 5 on BT, 5 on TO and 1 on BI. On BT and TO that is the most any single area carries. On BI it is a single question. Grid Prep has 45 questions on it. In the bank, they most often cite TOP-001-6. Two are free below.

Free sample: 2 of 45

Answer each one before you open the explanation. On the exam there's no explanation, and you have about 77 seconds a question on RC and BT, 90 on TO and BI.

Question 1 · Recall

Which entity develops, implements and maintains the outage coordination process used for generation and Transmission outages in an area?

  1. A. The Reliability Coordinator
  2. B. The Transmission Operator
  3. C. The Balancing Authority
  4. D. The Transmission Owner
Show the answer

Answer A The Reliability Coordinator

IRO-017-1 R1 places the outage coordination process on the Reliability Coordinator, including submission timing, evaluation of outage impacts across its Wide Area and resolution of outage conflicts. R2 then requires each Transmission Operator and Balancing Authority to perform the functions that process assigns to it.

Reference: IRO-017-1 R1 and R2

Question 2 · Application

Closing a normally open 138 kV tie breaker will parallel two systems that have been running separately. What must the operator verify at the open breaker before closing it?

  1. A. Load current on both sides of the breaker is below the Normal Rating
  2. B. Voltage magnitude, phase angle and frequency match across the breaker
  3. C. Reactive Power flow on each side of the breaker is close to zero
  4. D. Relay targets at both stations have been reset since the last trip
Show the answer

Answer B Voltage magnitude, phase angle and frequency match across the breaker

Closing the tie brings two separately running systems into synchronism, so the check across the open point is that voltage magnitude, phase angle and frequency are within the closing limits. A large angle or voltage difference produces a power surge through the breaker and shocks connected machines.

Reference: Power system fundamentals; control-room operating practice

The full bank

The other 43 Switching questions

Full Access opens all 45 in this area as 12-question sets, least-seen first, plus the rest of the 1,224 and unlimited mock exams at exam pace. The Library card for 2.d holds the area's seven must-know numbers. To start free in the browser: 50 practice answers and a 30-question timed taster, split to your exam's weighting.