Free sample: 3 of 30
Answer each one before you open the explanation. On the exam there's no explanation, and you have about 77 seconds a question on RC and BT, 90 on TO and BI.
A 230 kV line flow has read exactly 214 MW for 20 minutes, while the flow and voltage points telemetered from the far end of the same line keep moving with load. What does this most likely indicate?
- A. The load in that area has been constant for 20 minutes
- B. The flow is held by a Remedial Action Scheme
- C. The far-end meter has drifted out of calibration
- D. The point is stale and the link has stopped updating it
Show the answer
Answer D The point is stale and the link has stopped updating it
A value frozen to the digit while the matching measurement at the other end of the same line keeps changing is a telemetry failure, not a system condition: the remote terminal unit or its communications path has stopped answering the scan, and the display is holding the last value received, normally with a quality flag. Calibration drift offsets a reading rather than freezing it, and constant load cannot move one end of a line without moving the other.
Reference: Control-room operating practice
A Transmission Owner receives the documented data and information specification that its Transmission Operator has distributed. What does that place on the Transmission Owner?
- A. A duty to satisfy the obligations the specification sets out
- B. A duty to supply the data whenever asked for it
- C. A duty to renegotiate the deadlines through its Reliability Coordinator
- D. A duty to publish a matching specification within 30 calendar days
Show the answer
Answer A A duty to satisfy the obligations the specification sets out
TOP-003-7 R5 puts the duty on the entity that receives a distributed data and information specification: it shall satisfy the obligations of that documented specification, whatever they are. A Transmission Owner is one of the entities named, and the specification stands on its own; it is not a request that has to be repeated each time the data is needed.
Reference: TOP-003-7 R5; TOP-003-7 R3
At 09:20 a Transmission Operator's test of its primary Control Center data exchange capabilities for redundant functionality fails. What must it do about that failed test?
- A. Repeat the redundancy test within 24 hours
- B. Have full redundant functionality back in service by 11:20
- C. Initiate action to restore redundant functionality by 11:20
- D. Report the failed test to the Regional Entity
Show the answer
Answer C Initiate action to restore redundant functionality by 11:20
TOP-001-6 R21 calls for the test at least once every 90 calendar days and, when a test is unsuccessful, for action initiated within two hours to restore redundant functionality. The deadline is for starting the work, not for finishing it, which is why 11:20 is the moment action must be under way rather than complete.
Reference: TOP-001-6 R21