4.d · Emergency Response · free sample

Response to Loss of Control Center

4.d Response to Loss of Control Center is one of the 31 knowledge areas in the NERC System Operator Certification content outlines. It is worth 2 scored questions on RC, 2 on BT, 2 on TO and 2 on BI. It carries the same weight on all four exams. Grid Prep has 30 questions on it. In the bank, they most often cite EOP-008-2 and COM-001-3. 3 are free below.

Free sample: 3 of 30

Answer each one before you open the explanation. On the exam there's no explanation, and you have about 77 seconds a question on RC and BT, 90 on TO and BI.

Question 1 · Application

A Transmission Operator adds new alarm points and new displays to the energy management system at its primary control center. Which part of its Operating Plan for backup functionality governs what happens next?

  1. A. The Operating Procedure for deciding when to move to backup
  2. B. The annual test demonstrating two continuous hours of backup use
  3. C. The list of entities notified when operating locations change
  4. D. The Operating Process keeping backup and primary consistent
Show the answer

Answer D The Operating Process keeping backup and primary consistent

R1 Part 1.3 requires an Operating Process for keeping the backup functionality consistent with the primary control center, which is what a change to primary displays and alarms triggers. The decision-authority procedure, the notification list and the annual test all deal with using or proving the backup, not with maintaining it in step.

Reference: EOP-008-2 R1 Part 1.3

Question 2 · Recall

A Reliability Coordinator's monthly test of its Alternative Interpersonal Communication capability comes back unsuccessful. What is required next?

  1. A. A replacement must be designated before the next monthly test
  2. B. Repair or replacement must be initiated within two hours
  3. C. The capability must be fully restored within two hours
  4. D. Its Regional Entity must be told within 24 hours of the test
Show the answer

Answer B Repair or replacement must be initiated within two hours

After an unsuccessful test the entity has 2 hours to initiate action to repair the capability or to designate a replacement. The trap is full restoration in two hours: the obligation is to start the repair or name a substitute, not to have the link working again by then.

Reference: COM-001-3 R9

Question 3 · Analysis

During a planned cutover to its backup control center, a Balancing Authority's telemetry to its Reliability Coordinator will be out for about twenty minutes. What should the operator do?

  1. A. Log the outage only, since telemetry is not a monitoring capability
  2. B. Notify the Reliability Coordinator, since all planned outages count
  3. C. Skip the notification, since the outage is under thirty minutes
  4. D. Notify the Regional Entity instead, since the outage is planned
Show the answer

Answer B Notify the Reliability Coordinator, since all planned outages count

The thirty-minute threshold applies only to unplanned outages. All planned outages of telemetering and control equipment, monitoring and assessment capabilities, and the associated communication channels are notified to the Reliability Coordinator and known impacted interconnected entities whatever their length.

Reference: TOP-001-6 R9

The full bank

The other 27 Loss of Control Center questions

Full Access opens all 30 in this area as 12-question sets, least-seen first, plus the rest of the 1,224 and unlimited mock exams at exam pace. The Library card for 4.d holds the area's seven must-know numbers. To start free in the browser: 50 practice answers and a 30-question timed taster, split to your exam's weighting.

In the iPhone, iPad and Mac app the Library is free, and Full Access is a one-time in-app purchase.