Answer each one before you open the explanation. On the exam there's no explanation, and you have about 77 seconds a question on RC and BT, 90 on TO and BI.
An Energy Management System vendor asks to take a Transmission Operator's Real-time Contingency Analysis out of service during the afternoon peak. Who must hold the authority to approve that outage?
- A. The Transmission Operator's compliance manager
- B. The Transmission Operator's own System Operators
- C. The Transmission Operator's Reliability Coordinator
- D. The Transmission Operator's Balancing Authority
Show the answer
Answer B The Transmission Operator's own System Operators
TOP-001-6 Requirement R16 requires the Transmission Operator to give its System Operators the authority to approve planned outages and maintenance of telemetering and control equipment, monitoring and assessment capabilities, and associated communication channels. IRO-002-7 Requirement R4 places the same authority with the Reliability Coordinator's own System Operators for its tools.
Reference: TOP-001-6 R16; IRO-002-7 R4
TOP-003-7 names three of a Balancing Authority's own functions as the reason it must specify what data it needs from other entities. Two of them are its analysis functions and its Real-time monitoring. What is the third?
- A. Operational Planning Analyses for next day
- B. Real-time Assessments of its own Area
- C. The annual Planning Assessment it receives
- D. Near-Term Energy Reliability Assessments
Show the answer
Answer D Near-Term Energy Reliability Assessments
TOP-003-7 R4 has each Balancing Authority distribute its data and information specification to the entities holding what its analysis functions, Real-time monitoring and Near-Term Energy Reliability Assessments require. Real-time Assessments and Operational Planning Analyses belong to the Transmission Operator's specification under R3, not the Balancing Authority's, and the Planning Assessment is a planning document rather than an operating one.
Reference: TOP-003-7 R2, R4; compare TOP-003-7 R1, R3
A Transmission Operator loses the link that carries status, voltage and flow data for Facilities outside its Transmission Operator Area that it has identified as necessary. What must it do while the link is down?
- A. Hand the outside monitoring to its Reliability Coordinator
- B. Monitor only the Facilities inside its own Area
- C. Obtain the data another way until the link returns
- D. Fall back on the values held when the link failed
Show the answer
Answer C Obtain the data another way until the link returns
TOP-001-6 R10 Part 10.4 has the Transmission Operator obtain and utilize status, voltages and flow data for Facilities outside its Area that it has identified as necessary, and losing one delivery path does not lift that duty. A voice call to the neighboring operator or a feed from the Reliability Coordinator keeps the data coming, while frozen values would quietly age as the System moves.
Reference: TOP-001-6 R10 Part 10.4