5.c · Contingency Analysis and Reliability · free sample

Response to Results of Contingency Analysis

5.c Response to Results of Contingency Analysis is one of the 31 knowledge areas in the NERC System Operator Certification content outlines. It is worth 5 scored questions on RC, 4 on BT, 4 on TO and 2 on BI. On RC that is the most any single area carries. Grid Prep has 45 questions on it. In the bank, they most often cite IRO-009-2, TOP-001-6 and IRO-001-4. Two are free below.

Free sample: 2 of 45

Answer each one before you open the explanation. On the exam there's no explanation, and you have about 77 seconds a question on RC and BT, 90 on TO and BI.

Question 1 · Application

Line A carries 420 MW and line B 360 MW. Contingency analysis studies the loss of line B, for which the line-outage distribution factor onto line A is 0.35. What flow does the study put on line A?

  1. A. 546 MW
  2. B. 780 MW
  3. C. 294 MW
  4. D. 126 MW
Show the answer

Answer A 546 MW

A line-outage distribution factor is the share of the outaged line's pre-Contingency flow that redistributes onto the monitored line, so line A picks up 0.35 x 360 = 126 MW on top of the 420 MW it already carries, giving 546 MW. Adding all 360 MW of line B's flow gives 780 MW and assumes line A is the only remaining path.

Reference: Power system fundamentals; Control-room operating practice

Question 2 · Application

A Reliability Coordinator's Real-time Assessment shows a condition that could lead to a System Operating Limit exceedance, though it might not. What does IRO-008-3 require?

  1. A. Notify the impacted entities once the exceedance is confirmed
  2. B. Notify the impacted entities now, in accordance with its SOL methodology
  3. C. Notify only the Transmission Operator that owns the limiting Facility
  4. D. Notify no one until its next Real-time Assessment repeats the result
Show the answer

Answer B Notify the impacted entities now, in accordance with its SOL methodology

IRO-008-3 R5 is triggered by an actual or expected condition that results in, or could result in, a SOL or IROL exceedance, so the notice goes out on the "could". It reaches the impacted Transmission Operators and Balancing Authorities in the Area and other impacted Reliability Coordinators named in the Operating Plan, in accordance with the SOL methodology.

Reference: IRO-008-3 R5

The full bank

The other 43 Contingency Results questions

Full Access opens all 45 in this area as 12-question sets, least-seen first, plus the rest of the 1,224 and unlimited mock exams at exam pace. The Library card for 5.c holds the area's seven must-know numbers. To start free in the browser: 50 practice answers and a 30-question timed taster, split to your exam's weighting.

In the iPhone, iPad and Mac app the Library is free, and Full Access is a one-time in-app purchase.