Generation Equipment

1.g Generation Equipment is one of the 31 knowledge areas in the NERC System Operator Certification content outlines. It is worth 3 scored questions on RC, 4 on BT, 2 on TO and 5 on BI. On BI that is the most any single area carries. Grid Prep has 45 questions on it. In the bank, they most often cite VAR-002-4.1, PRC-019-2 and MOD-025-2. 3 are free below.

Free sample: 3 of 45

Answer each one before you open the explanation. On the exam there's no explanation, and you have about 77 seconds a question on RC and BT, 90 on TO and BI.

Question 1 · Recall

The per unit voltages in the PRC-024-4 Attachment 2 no trip boundaries are referred to one particular measurement location. Which location is it?

  1. A. The generator terminals, on the machine side of the breaker
  2. B. The high side of the generator step-up transformer
  3. C. The low side of the generator step-up transformer
  4. D. The unit auxiliary transformer secondary bus
Show the answer

Answer B The high side of the generator step-up transformer

Attachment 2 states that its voltage values are at the high side of the generator step-up transformer or main power transformer, with the per unit base being the nominal transmission system voltage unless the Transmission Planner specifies otherwise. Where protection actually measures voltage elsewhere, the setting has to be evaluated back to that high-side reference.

Reference: PRC-024-4 R2; Attachment 2

Question 2 · Recall

In the Eastern Interconnection, within which frequency band does the PRC-024-4 Attachment 1 no trip zone call for continuous operation rather than a minimum ride-through time?

  1. A. Above 59.5 Hz and below 60.5 Hz
  2. B. Above 59.4 Hz and below 60.6 Hz
  3. C. Above 57.8 Hz and below 61.8 Hz
  4. D. Above 58.4 Hz and below 61.6 Hz
Show the answer

Answer A Above 59.5 Hz and below 60.5 Hz

The Eastern Interconnection table shows continuous operation above 59.5 Hz and below 60.5 Hz; beyond that band the no trip zone is bounded by a minimum time that shortens as frequency moves further from 60 Hz, ending in an instantaneous allowance at 61.8 Hz and at 57.8 Hz. The wider 59.4 Hz to 60.6 Hz continuous band belongs to the Western, Quebec and ERCOT tables, not to the Eastern one.

Reference: PRC-024-4 R1; Attachment 1, Table 1

Question 3 · Analysis

A combustion turbine came on line 20 minutes ago under a four-hour minimum run time, and the forecast peak has now passed. What should the operator plan around?

  1. A. The unit coming off at once, since minimum run time is advisory
  2. B. The unit staying on line until its minimum run time is served
  3. C. The unit holding full output until the minimum run time ends
  4. D. The unit's minimum run time restarting each time output is cut
Show the answer

Answer B The unit staying on line until its minimum run time is served

Minimum run time is a physical commitment constraint, so the unit is committed for the balance of the four hours and the dispatch has to absorb its output. It can still be backed down toward minimum load during that period; what it cannot do is come off early without cause.

Reference: Control-room operating practice

The full bank

The other 42 Generation Equipment questions

Full Access opens all 45 in this area as 12-question sets, least-seen first, plus the rest of the 1,224 and unlimited mock exams at exam pace. The Library card for 1.g holds the area's seven must-know numbers. To start free in the browser: 50 practice answers and a 30-question timed taster, split to your exam's weighting.

In the iPhone, iPad and Mac app the Library is free, and Full Access is a one-time in-app purchase.