Free sample: 3 of 30
Answer each one before you open the explanation. On the exam there's no explanation, and you have about 77 seconds a question on RC and BT, 90 on TO and BI.
Eastern Interconnection frequency settles at 59.6 Hz for two minutes after a large generation loss. Under NERC Reliability Standard PRC-024-4 Attachment 1, applicable frequency protection must
- A. trip the resource once the excursion has lasted more than 180 seconds
- B. let the resource keep operating, since 59.6 Hz is above 59.5 Hz
- C. trip the resource instantaneously, as 59.6 Hz is below 60.0 Hz
- D. allow ten seconds of operation and then trip the resource
Show the answer
Answer B let the resource keep operating, since 59.6 Hz is above 59.5 Hz
Table 1 of Attachment 1 places the Eastern Interconnection continuous-operation boundary above 59.5 Hz, so at 59.6 Hz the protection must not trip the resource, no matter how long the excursion lasts. The 180-second figure comes from the Western Interconnection table, at 59.4 Hz and below.
Reference: PRC-024-4 R1 and Attachment 1, Table 1
In the NERC Glossary of Terms, the defined term Curtailment refers specifically to...
- A. a cut in the transfer capability of a constrained transmission path
- B. a cut in Firm Demand served while an Energy Emergency is declared
- C. a cut in the scheduled capacity or energy of an Interchange Transaction
- D. a cut in a wind or solar plant's output ordered by the dispatcher
Show the answer
Answer C a cut in the scheduled capacity or energy of an Interchange Transaction
NERC's definition is narrow: it is a reduction in the scheduled capacity or energy delivery of an Interchange Transaction. Backing a wind or solar plant down is a dispatch action operators also call curtailment in conversation, but it is not what the defined term covers.
Reference: NERC Glossary - Curtailment
Wind turbine output varies with the cube of wind speed below rated wind speed. If the wind at a plant rises 10% while it is still below rated, available Real Power rises by...
- A. about 21%
- B. about 33%
- C. about 10%
- D. about 66%
Show the answer
Answer B about 33%
Power in the wind goes as the cube of speed, so 1.10 cubed is 1.331, about a 33% increase. Squaring instead of cubing gives 21%, and treating the relationship as linear gives 10%.
Reference: Power system fundamentals